Total miles
1,604 mi
Energy consumed
1,703 kWh
Efficiency
1.062 kWh/mi
Avg driving speed
47.5 mph
Avg highway speed
51.3 mph
Drive time
~26 hrs
Charging time
17.0 hrs
Charging cost
$885
Cost per mile
$0.55 /mi
Avg cost / kWh
$0.56 /kWh
Miles & energy by day
May 16
745 mi
582 kWh · 7 stops
May 17
49 mi
117 kWh · 2 stops
May 18
472 mi
555 kWh · 9 stops
May 19
338 mi
449 kWh · 7 stops
May 17 kWh is high relative to miles because the two big charges (80 + 98 kWh) were restoring energy consumed May 16 and pre-loading for May 18's return.
Battery state of charge across the trip
kWh per charging stop
Charging time by day
| Drive time | ~26.0 hrs |
| Charge time | 17.0 hrs |
| Charging stops | 25 |
| Avg stop duration | 41 min |
| Charge / drive ratio | 65% |
All 25 charging stops
- 12:17Scipio, UT — EA Flying J61.2 kWh26 min
- 13:52Beaver, UT — Tesla77.9 kWh30 min
- 15:12Cedar City, UT — Tesla56.2 kWh24 min
- 16:28Mesquite, NV — Tesla73.2 kWh63 min
- 19:48Las Vegas, NV — Tesla89.7 kWh51 min
- 20:43Baker, CA — EA57.6 kWh28 min
- 22:13Barstow, CA — Rivian RAN73.0 kWh29 min
- 00:01San Bernardino, CA — Rivian RAN80.4 kWh46 min
- 12:55San Diego, CA — Tesla98.4 kWh81 min
- 08:05San Diego — ChargePoint (overnight)38.1 kWh185 min
- 10:48Perris, CA — Tesla93.4 kWh51 min
- 13:12Barstow, CA — Rivian RAN96.9 kWh53 min
- 14:21Baker, CA — EA (failed)3.1 kWh1 min
- 14:49Baker, CA — EA (retry)58.6 kWh24 min
- 16:49Primm, NV — EA97.1 kWh58 min
- 18:10N Las Vegas, NV — Tesla37.2 kWh24 min
- 19:31Mesquite, NV — Tesla 1A19.3 kWh13 min
- 19:48Mesquite, NV — Tesla 1B40.5 kWh14 min
- 09:38St. George, UT — Tesla75.1 kWh29 min
- 10:34Cedar City, UT — Tesla 2B38.8 kWh14 min
- 10:39Cedar City, UT — Tesla 2C8.0 kWh4 min
- 11:05Cedar City, UT — Tesla 1B45.3 kWh24 min
- 12:48Beaver, UT — Tesla94.0 kWh51 min
- 14:59Scipio, UT — EA Flying J77.4 kWh33 min
- 16:59Nephi, UT — Tesla96.9 kWh68 min